32
14
14.1: Pre-fold Skylight before installing.
14.2: Push folded skylight up through opening; open skylight; use tabs to
pull skylight down into place.
14.3: Fasten skylight in place with screws (pull on tabs while inserting screw
to provide resistance). Repeat these steps for the second skylight.
LA (6)
LB (6)
Only use a hand screwdriver
on this step
Skylight Installation
Hardware Bags:
1000315
Screwdriver
15
Fig. 1
Fig. 2
High Side
High side Low side
Shim should be placed at the corner,
running directly under one wall.
First
Shim
Second
Shim
15.1: In some cases, the shed doors may not completely line up at the tops (fi g. 1). When this happens, identify
which side is higher and use a shim (BE) to slightly raise the back corner of the high side until doors line up (fi g. 2). If
doors need further adjustment, insert another shim under the front corner opposite of the fi rst shim. If the doors still
need further adjustment, stack additional shims (one at a time) alternating between the back and front shims.
15.2: After doors are aligned, cut off any portion of wood shim that is still
exposed. From inside the shed, drive a 1” nail through the fl oor into the shim
to hold it in place.
Align Doors
LA
LB