TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
11
SEC
1.1
ASIX
ARL X
3/16”
Slide a Washer (ARL) over a 5/16” x v"OLt (ASI)THENSLIDETHE"OLT
through the two 'REEN4UBESWITH3TICKER#0& and four Light Brown Tubes
(CPD) in the order indicated by the numbers. Slide another Washer
OVERTHE"OLTANDSECUREWITHA5/16” Standard Nut (ATL). Hold the
.UTWITHAWRENCHWHILETIGHTENINGTHE"OLT4IGHTENCOMPLETELYTO
prevent movement.
ARL
ASI
ATL
Note: Repeat this step five times, making five joints.
!
ARL
CPD
CPD
CPD
CPD
#0&
#0&
ATLX