TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
13
SEC
1.3
ATLX
ARL X
Note: The Geo-Dome should be stood upright to complete this
step and the rest of the assembly.
!
3/16”
1/2”
"RINGTHEASSEMBLESCOMPLETEDINSTEPSANDTOGETHERAS
shown. Place a Green Tube (CPC) over the Light Brown Tubes (CPD) and
SECURETHE'REENAND,IGHT"ROWN4UBESTOGETHERATTHETOPJOINTAS
shown below by placing a 5/16” x vBolt (ASI) through Washer (ARL)
THENTHROUGHTHE"ROWN4UBESAND'REEN4UBE0LACEA7ASHEROVER
THE"OLTANDlNGERTIGHTENTHE5/16” Standard Nut (ATL) for removal later.
ASI
ARL
ARL
ATL
ASIX
CPC
CPC
CPD
CPD