AURORIS SYSTEM AURORIS SYSTEMPAGE 13 PAGE 14
LIFT
LIFT
LIFT
FOLDING INSTRUCTIONS
AURORIS V
AURORIS X
Begin by laying your Auroris fl at, LED side down,
on a clean surface. It is recommended to use
the included ground tarp.
Begin by laying your Auroris fl at, LED side down,
on a clean surface. It is recommended to use
the included ground tarp.
Lift the inner crease points of the three outer
panels upward. Walk the sides inward until all
panels are touching.
Let the section lay fl at. At this point, the folded
Auroris should be one row wide with the white
sections on the inside and black on outside.
With two people on opposite sides (tag and
cable sides) lift up along the center crease to
form an “A” shape. Use the center D-ring to
assist in lifting.
With two people on opposite sides (tag and
cable sides), in one motion, lift and fold the
outer rows, one row at a time, over the center
rows of the Auroris.
Lay the folded Auroris fl at. Your Auroris is ready
to be stored in the storage bag.
Lift the inner crease points of the two outer
panels upward. Walk the sides inward until all
panels are touching.
Let the section lay fl at. At this point, the folded
Auroris should be one row wide with the white
sections on the inside and black on outside.
Lift up along the center crease to form an “A”
shape. Use the center D-ring to assist in lifting.
Lay the folded Auroris fl at. Your Auroris is ready
to be stored in the storage bag.
STEP 1 STEP 1
STEP 4 STEP 4
STEP 2
STEP 5
STEP 2
STEP 5
STEP 3 STEP 3
STEP 6
LIFT
LIFT
FOLD IN
FOLD IN