BACKHOE OPERATION
CAUTION:
Do not put piles of spoil close to the edge of
the digged hole, it may cause a cave-in.
Make a plan in advance where to put the piles of spoil
considering where to dig.
Street Pads(Option)
Install street pads under the stabilizer pads when
operating on street to prevent damage to work area.
Piles of Spoil
If there are teeth in the bucket, remove them before
digging vertical walls.
Extend the boom slowly while lowering the bucket to
the far vertical wall.
Dump the bucket until the bottom of the bucket be
always in a vertical position.
Digging Vertical Walls
Crowd out the far wall while forcing the bucket down
with the boom.
Raise the boom to finish the near wall while crowding
in. Curl in the bucket to keep the bucket edge
horizontally with the wall while raising the boom.
- 20 -