363-205-401 Power Up:
Issue 7, March 1997 Page 1 of 8
DLP-513
Perform Installation and Tests of Batteries for
Existing 51-Type (ED-7C601-30) Cabinet RT
SUMMARY:
Install and connect four KS-21906, L4 battery packs in each battery
shelf. With fuses removed, measure voltage greater than 45 V DC at power panel
(string 2) or at battery shelf (string 3). Install battery and heater fuses. Connect
J113
to
P113
on battery shelf.
1. Ensure that connector
J113
from power shelf is not connected to connector
P113
on battery shelf.
2.
!
DANGER:
High current flow will occur if short is placed across battery terminals. No
attempt should be made to measure battery voltage across terminals.
NOTE:
Lower two battery shelves house battery string 1 and upper two battery
shelves house battery string 2 (when installed). If additional battery string
(battery string 3) is required, a 181A apparatus mounting can be installed
in top of battery section to house it.
Get four KS-21906, L4 battery packs.
3. Is battery string 2 being installed?
If
YES,
then continue with Step
4.
If
NO,
then proceed to Step
20.
4. Place batteries on battery shelves and dress battery cables as each battery
pack is placed on shelf.