RT Turn Up: NTP-003 363-205-401
Page 6 of 8 Issue 7, March 1997
DO ITEMS BELOW IN ORDER LISTED FOR DETAILS, GO TO
22.
NOTE:
All
LIU
s in the same system should have identical option
switch settings.
NOTE:
FPB Mode 2 does not require an LIU in LIU-D slot. FPD
requires a TCU in LIU-D slot.
DLP-512Install DS1
LIU
in
LIU-D
slot in facility shelf after making option,
equalizer, and transmit pad settings for FPA, FPB mode 1, FPC,
FPC-AutoCut, or FPF.
DLP-51523. If protection switching is desired, install associated
LSU
(line
switch unit) in facility shelf. Otherwise, proceed to Step
25
.
24.
NOTE:
All
LIU
s in the same system should have identical option
switch settings.
DLP-512Install associated DS1 protection
LIU
(if required) in
LIU-P
slot in
facility shelf after making option, equalizer, and transmit pad set-
tings.
25.
NOTE:
The
CTU
is used with the pair gain test controller (PGTC) or
extended test controller (XTC) to enable remote testing of
channel units and subscriber lines beyond the remote
terminal. The
AUB25
is compatible with the MC97756A1 or
MC97771A1 BCU and provides special service test
capability if the XTC is used. The
AUB22
is compatible with
any feature package."except FPD.
DLP-516Install
CTU
(channel test unit) (if the XTC or PGTC is used for
remote testing and
CTU
has not been previously installed).
DLP-51726. Install
DTU
(digital test unit) (if required).
DLP-51827. Perform RT indicator test.
28. If equipping additional shelves in dual bank assembly (white sys-
tem), proceed to Step
4
. Otherwise, continue with Step
29
.