Power Up: NTP-007 363-205-401
Page 4 of 4 Issue 7, March 1997
DO ITEMS BELOW IN ORDER LISTED FOR DETAILS, GO TO
11.
NOTE:
Testing of the PCU in a Fiber to the Home RT channel bank
is not required at this time. This test will be done when the
J1C1182PB-1 Optics Power Shelf is turned up.
Install and test
PCU
, then remove
PCU
;
DLP-511A. in dual RT channel bank facility (middle) shelf.
DLP-530B. in J1C182PB-1 Optics Power Shelf (any slot).
12. Turn circuit breaker off. Repeat Steps
9
through
11
for each circuit
breaker. Then continue with Step
13
.
13. Update office records.