Power Up: DLP-503 363-205-401
Page 8 of 10 Issue 7, March 1997
27. Remove fuses, if present, from
+BAT
and
BAT
fuse holders on battery shelf.
28. Condition DMM to measure DC volts.
29. On battery shelf, connect DMM test leads to
+BAT
jack (
J5
) and
BAT
jack
(
J6
).
30. Does meter indicate greater than 45.0 volts DC?
If
YES,
then proceed to Step
39.
If
NO,
then continue with Step
31.
31. Check battery lead connections at battery shelf.
32. Does meter indicate greater than 45.0 volts DC?
If
YES,
then proceed to Step
39.
If
NO,
then continue with Step
33.
33.
NOTE:
If voltage requirements are not met after replacement battery pack is
installed, original battery pack should be reinstalled in battery shelf.
Replace one of the battery packs.
34. On battery shelf, connect DMM test leads to
+BAT
jack (
J5
) and
BAT
jack
(
J6
).
35. Does meter indicate greater than 45.0 volts DC?
If
YES,
then proceed to Step
39.
If
NO,
then continue with Step
36.
36. Have all battery packs been replaced?
If
YES,
then continue with Step
37.
If
NO,
then proceed to Step
38.
37. Check battery lead connections at battery shelf. Repeat procedure from Step
29
after locating and correcting trouble.