EasyManua.ls Logo

Lucent Technologies SLC 5 Series - Page 96

Lucent Technologies SLC 5 Series
508 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
363-205-401 Power Up: DLP-503
Issue 7, March 1997 Page 9 of 10
38.
NOTE:
If voltage requirements are not met after replacement battery pack is
installed, original battery pack should be reinstalled in battery shelf.
Select another battery pack on battery shelf and repeat from Step
33.
39. Remove DMM test leads.
40. Install good 25-Amp fuses (Buss ABC or equivalent) into
+BAT
and
BAT
fuse holders on battery shelf.
41. Install good 5-Amp fuse into
HTR
fuse holder on battery shelf.
42. At power panel, reinstall
HEATERS
fuse(s)
F5
and/or
F6
for battery string(s)
installed.
43. Turn AC power circuit breaker on and ensure that AC power cord is connected
to power shelf plug (
P112
).
STOP. YOU HAVE COMPLETED THIS PROCEDURE.

Related product manuals