0-2
2. Operation and Controls
2.1 Before starting engine
2.1.2 Checks before starting
2.2.1 Starting the engine with main starter switch
2.2.2 Start the engine with main starter switch in cold weather
2.2.3 Starting the engine with auxiliary starter switch
2.3 Operation and checking after engine has started
2.5 Travel position of the machine
2.7 Change travel direction of the machine
2.8 Stopping and parking the machine
2.10 Inspection and check after stopping the engine
2.11 Rules for travelling
2.12 Setting up the outrigger
2.13 Matters to be known before starting crane work
2.14 Operations prior to starting crane work
2.16 Hoisting and lowering operation
2.17 Boom hoisting and lowering operation
2.18 Boom telescoping operation
2.20 Accelerator lever operation
2.21How to use load indicator and load meter
2.23 Stowing the outrigger
2.24 Matters prohibited in connection with crane operation
3. Handling of Rubber Tracks
3.1 Smart way of using it
3.3 Prohibited types of work
4.1 Standard for wire rope replacement
4.2 Measures to take when winch wire rope is twisted
5.1 Loading and unloading
5.2 How to lift the machine
6. Handling in Cold Climate
6.1 Preparation for low ambient temperature