EasyManua.ls Logo

Manitowoc National Crane NBT45 - User Manual

Manitowoc National Crane NBT45
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
National Crane NBT40
Series
Operator Manual

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Manitowoc National Crane NBT45 and is the answer not in the manual?

Manitowoc National Crane NBT45 Specifications

General IconGeneral
ModelNBT45
Maximum Lift Capacity45 tons
Boom Length31 ft - 127 ft (9.4 m - 38.7 m)
Engine Power350 hp (261 kW)
Maximum Tip Height137 ft (41.8 m)
TransmissionAutomatic

Summary

Set-Up Procedures

Jib Operation Procedures

Instructions for deploying, stowing, and removing the crane jib.

Jib Deployment Procedure

Step-by-step guide for safely extending and attaching the jib to the crane.

Jib Stowing Procedure

Detailed instructions for safely retracting and securing the jib.

Safety Precautions and Guidelines

Safety Messages and Symbols

Explains the use of safety alert symbols and signal words for hazard communication.

Crane Stability and Structural Strength

Outlines requirements for ensuring crane stability and structural integrity during operation.

Load Chart Usage

Explains the importance and use of load charts for determining lifting capacities.

Electrocution Hazard Prevention

Details risks and precautions related to operating cranes near electrical power lines.

Controls and Operating Procedures

Outrigger Setup Procedures

Step-by-step instructions for properly extending and leveling the crane using outriggers.

Load Chart Usage Guide

How to use the load chart to determine lifting capacities for various configurations.

Lifting the Load Safely

General guidelines for performing a lift safely after the crane is properly set up.

Maintenance Checklist and Procedures

Crane Inspection and Maintenance

Outlines required inspection and maintenance intervals for peak crane performance.

Related product manuals