EasyManua.ls Logo

MASSEY FERGUSON 2800 Series - Page 11

MASSEY FERGUSON 2800 Series
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
PTO
Clutch
Lever
PTO
Drive
Pulley
Belt
Tensioning
Lever
Mower
Drive
Belt
Lift
Anchor
Lift
Cable
Clevis
Deflector
Mower
Drive
Pulley
Mower
Hitch
Arm
Tractor
Front
Hitch
Lift
Lever
Front
Idler
Pulley
Rear
Idler
Pulley
*2248
Figure
4.
Mower
Installation
&
Removal
(A,
figure
5)
should
be
aligned
with
the
front
edge
of
the
green
zone
shown
in
figure
5.
The
distance
between
idler
bracket
(A)
and
stop
(C)
will
be
approx¬
imately
1-3/16”
(30
mm).
14.
Push
the
belt
tensioning
lever
down
to
release
belt
tension.
Loosen
the
nut
that
secures
the
rear
idler
pulley
(D,
figure
5)
in
the
slot.
To
move
the
idler
bracket
(A)
forward,
move
rear
idler
pulley
(D)
rear¬
ward.
Tighten
the
nut
to
secure
pulley.
Pull
the
belt
tensioning
lever
up
and
check
position
of
idler
brack¬
et
(A).
Readjust
as
necessary.
15.
Operate
the
tractor
with
mower
engaged
for
15
-
30
minutes
with
a
new
belt;
about
two
minutes
with
a
used
belt.
Disengage
the
PTO,
stop
the
engine,
remove
the
key,
shift
into
neutral
and
set
the
parking
brake.
Check
position
of
the
idler
bracket
(A,figure
5).
If
the
rear
edge
of
the
bracket
is
not
aligned
with
front
edge
of
green
zone,
repeat
step
14.
Check
adjustment
periodically.
If
rear
edge
of
idler
bracket
moves
into
red,
repeat
step
14.
9

Related product manuals