EasyManua.ls Logo

Matt:e B60 - Dimensions & Mounting the Unit

Matt:e B60
11 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
B60 Voltage Optimisation Unit
7 | P a g e
Mounting the unit
The unit is designed to be installed between the main electricity meter and consumer
unit in the most practical and accessible position available.
The installation location should be clean, dry and well ventilated.
Please refer to the diagram below for the dimensions and mounting arrangements of
the unit.
NOTE: The unit weighs approximately 10.0kgs. Always handle the unit with both
hands.
B60
Danger 230Volts
Maximum Load 60A
!
Caring about your world
Made in Britain
Made in Britain