EasyManua.ls Logo

MC VISTA MEDIUM HANGING - Wall Installation Preparation; Determine Mounting Location and Mark Studs; Drill Pilot Holes

Default Icon
9 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ASSEMBLY AND INSTALLATION INSTRUCTIONS
MEDIUM HANGING UNIT - 18" / 24" / 30" / 36"
INSTALLATION
6
6.1
6.2
6.3
Determine the mounting location for the unit.
Using a stud finder, locate studs to which the unit will be secured. Mark stud locations with a pencil.
With the unit positioned at the desired location, level the unit, then drill pilot holes through Rear Hanging Cleats (E),
NOTE: For 18" and 24" units, it is likely that only one stud will pass through the unit. In these cases, use two screws
through each Rear Hanging Cleat.
STANDARD
HEIGHT
-
84" FROM
FLOOR
PILOT HOLES
STUDS
E
E