ASSEMBLY AND INSTALLATION INSTRUCTIONS
MEDIUM HANGING UNIT - 18" / 24" / 30" / 36"
INSTALLATION
6
6.1
6.2
6.3
Determine the mounting location for the unit.
Using a stud finder, locate studs to which the unit will be secured. Mark stud locations with a pencil.
With the unit positioned at the desired location, level the unit, then drill pilot holes through Rear Hanging Cleats (E),
NOTE: For 18" and 24" units, it is likely that only one stud will pass through the unit. In these cases, use two screws
through each Rear Hanging Cleat.
STANDARD
HEIGHT
-
84" FROM
FLOOR
PILOT HOLES
STUDS
E
E