17-CLEANING
END-OF-SEASON SHUTDOWN
At the end of each season, before switching the product o, it is recommended to remove all the pellets from the hopper with a vacuum
cleaner with a long pipe.
When not in use the appliance must be disconnected from the mains power supply. It is recommended to remove the
power cable for additional safety, especially in the presence of children.
The service fuse may have to be replaced if the control panel display does not switch on when the product is switched on again by pressing
the main switch on its side.
There is a fusebox on the side of the product, near the power socket. Open the fusebox cover with a screwdriver and replace the fuses if
necessary (3.15 A delayed) - seek assistance from an authorised and qualied technician.
CHECKING THE INTERNAL COMPONENTS
ATTENTION!
The internal electromechanical components must only be checked by qualied personnel whose technical expertise
includes combustion and electricity.
We recommend that an annual maintenance service is carried out with a scheduled service contract. This service is essentially a visual and
functional inspection of the following components: The following is a summary of the checks and/or maintenance that are indispensable
for the correct operation of the product.
PARTS/INTERVAL 1 DAY 23 DAYS 15/20 DAYS 1 YEAR
Brazier
Ash pan
Glass
Upper exchanger
Lower exchanger
Smoke duct
Gaskets
Air lter
Remote control battery
Door closure operation