SD-6029, Rev 2
WARNING This information contains technical data
subject to the EAR: ECCN: EAR99
Page 41 of 50
4 Maintaining the ACT1000/ACT1000HF
Under normal operation, the ACT1000/ACT1000HF requires no formal maintenance program.
Regularly scheduled inspections should be performed to check for:
actuator-to-load alignment
any damage to housing or mounting hardware
any damage to power and signal harnesses
parts that are worn, loose, or shifted due to shock, vibration, etc.
4.1 Refurbishment
PECC recommends that the ACT1000/ACT1000HF be shipped back to the factory for
refurbishment when the user’s system is shut down for overhaul (typically after approximately
40,000 hours of operation.) Contact PECC for details about refurbishment.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Meggitt ACT1000 and is the answer not in the manual?

Meggitt ACT1000 Specifications

General IconGeneral
BrandMeggitt
ModelACT1000
CategoryController
LanguageEnglish