EasyManua.ls Logo

Mercury 300 XS OptiMax - Page 131

Mercury 300 XS OptiMax
145 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OUTBOARD INSTALLATION
eng 125
Make the water pressure gauge hose connection to the tubing as shown.
a - Water pressure tube
b - Speedometer water pickup tube (if required)
c - Coupler
d - Plug
e - Barb hose fitting
f - Speedometer hose or tubing
g - Water pressure tube
h - Remote fuel hose
i - Hose clamp
j - Oil hose with blue stripe
k - Oil hose without blue stripe
l - Cable tie
INSTALLING THE SHIFT CABLE
IMPORTANT: The shift cable is the first cable to move when the remote control
handle is moved out of neutral, so install/connect it to the engine first.
Locating the Center Point of the Shift Cable
IMPORTANT: Locate the center point of the slack or lost motion that exists in
the shift cable for proper adjustment of the shift cable.
1. Mark the forward position as follows:
c
e
d
g
f
b
a
h
i
j
k
l
j
k
29069

Table of Contents

Related product manuals