EasyManua.ls Logo

Midea ECOHEAT Series - Unit Installation; Power Cord Installation

Midea ECOHEAT Series
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
3.1 Installation Instruction
3.2 Power Cord Installation
Check the capacity of power circuit (circuit breaker, wires, etc.)
Power cord installation;
Water heater installation;
Plumbing connection;
Power supply connection;
Water Supply.
Step 1 Step 2
3. UNIT INSTALLATION
Step 3 Step 4
Step 5 Step 6
Remove the screws at the bottom of the unit. Lift
the Main Switch Knob and Power Knob to make it
free. Remove the front plate gently.
Gash the middle of the film of the power cord
jacket with a sharp knife in order to put into
power lines.
Tighten the wire-pressing plate with screws to
primary position, ensure that the power cord not
be pulled out more than 60N.
Remove the power cord wire pressing plate and
keep the screws.
Insert by turning the power cord into the jacket for
installation of wire pressing plate.
Connect the power cord to wiring terminals; the
method is as shown in picture.

Related product manuals