ODMI-A-1110 
7). Mount the valve stem caps and the service port 
Use torque wrench to tighten the service port cap to a torque of 18N.m. 
Be sure to check for gas leakage. 
7.6 Re-installation while the indoor unit need to be repaired 
1. Collecting the refrigerant into the outdoor unit 
 
Procedure 
1). Confirm that both the 2-way and 3-way valves are set to the opened position 
Remove the valve stem caps and confirm that the valve stems are in the opened position. 
Be sure to use a hexagonal wrench to operate the valve stems. 
2). Connect the charge hose with the push pin of handle lo to the 3-way valves gas service port. 
3). Air purging of the charge hose. 
Open the handle Lo valve of the manifold valve slightly to purge air from the charge hose for 5 seconds 
and then close it quickly. 
4). Set the 2-way valve to the close position. 
5). Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa. 
6). Set the 3-way valve to the closed position immediately 
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa. 
Disconnect the charge set, and tighten the 2-way and 3-way valve’s stem nuts.