EasyManua.ls Logo

Midea MOU-18HN1-Q - Page 89

Midea MOU-18HN1-Q
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Insulation Work
Installation 85
3.2.3 Install the pendant bolt
Ceiling installation
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
expansible hooks (fittings).
Wall-mounted installation
Install the tapping screws onto the wall.(Refer to picture below)
3.2.4 Install the main body
Ceiling installation (The only installation method for the unit with drain pump)
Remove the side board and the grille.

Table of Contents

Related product manuals