§ Open the low-pressure valve on the charge set slightly to purge air from the charge hose. 
5. Set the 2-way valve to the close position. 
6. Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa. 
7. Immediately set the 3-way valve to the closed position. 
§ Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa. 
8. Disconnect the charge set, and amount the 2-way and 3-way valve’s stem nuts and service port 
caps. 
§ Use a torque wrench to tighten the service port cap to a torque of 1.8 kg.m. 
§ Be sure to check for gas leakage. 
 
 
 
 
 
 
8.6  Re-air purging (Re-installation) 
 
Procedure: 
1. Confirm that both the 2-way and 3-way valves are set to the closed position. 
2. Connect the charge set and a charging cylinder to the service port of the 3-way valve. 
§ Leave the valve on the charging cylinder closed. 
3. Air purging. 
§ Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut on 
the 2-way valve approximately 45’ for 3 seconds then closing it for 1 minutes; repeat 3 times. 
§ After purging the air, use a torque wrench to tighten the flare nut to on the 2-way valve. 
4. Check the gas leakage.