EasyManua.ls Logo

Midmark Preva - Page 124

Default Icon
138 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix A
Preva
117
FIGURE 115
3. Lift the shipping box and separate from the crate. There are two layers
of parts. Separate the top layer and place on the floor or remove each
piece individually.
NOTE: This is a two person job. Take extra care when handling the
articulating arm assembly to avoid any damage to the tubehead.
FIGURE 116
4. Cut the transportation band from the lower layer that holds the mobile
base.

Other manuals for Midmark Preva

Related product manuals