ASM installation, Continued
ASM on a
reservoir
Put the ASM onto the top of the Reservoir by following the steps below.
Step Action
1 Remove the lid coming with the storage reservoir. This lid will
no longer be used.
2 Take the ASM and verify that the o-ring is well positioned,
inside the lid.
3 Screw the ASM with its lid onto the reservoir until it is hand
tight. Since there is an o-ring inside the lid, there is no need to
overtighten it.
Electrical
connection
Make sure the Water System is not powered when connecting the
ASM electrical cable. In addition, make sure the ASM UV Lamp
is inside the Reservoir.
• The ASM is connected on the side of the water system.
• Push the connector into the socket located on the left side of the system.