© 2014 MIMAKI ENGINEERING CO.,LTD. 5.1 P.5
5.1 Changing the Joints
R.1.0
1
2
3
4
5
6
7
4. Connect the circulation path of the white ink and silver ink of
the carriage side.
[300 model]
5. Fix the banding bands again.
Release
1-7
2-7
1-8
2-8
Fittings of the circulation path
For the connection of the circulation route, refer
to the following.
• Dotted line in orange : Connect to 1-7 and 2-7.
• Solid line in orange : Connect to 1-8 and 2-8.
Dotted line in orange:
Connect to 1-7 and 2-7
Solid line in orange:
Connect to 1-8 and 2-8
Silver
(White)
White
Silver
(White)
White
For the tube tag, refer to the following.
1-2
1-1
1-8
1-6
1-7
1-4
1-5
1-3
2-2
2-1
2-8
2-6
2-7
2-4
2-5
2-3
Before ink charging, make sure that the fitting is firmly connected.
INSTALLATION GUIDE > Ink Set > Changing the Joints
Model
CJV300
Issue
2014.09.01
Revised F/W ver.
1.30
Remark
1.0