EasyManua.ls Logo

Mitox 260B - Page 9

Mitox 260B
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
260B Blower / 280BV Blower Vacuum
9
Original Instructions Version July 12
Important
Blower tube installation aects both blower Balance and performance! The tube and
Nozzle are correctly installed when the label TOP” is visible to the operator during normal
operation.
Fit the tapered blower tube over the
straight blower tube, aligning the channels
in the tube over the locking pins.
Twist the tapered blower tube tube to
engage the locking pins as illustrated.
Note the tapered discharge chute is
marked with a TOP side.

Related product manuals