© Mitsubishi Forklift Trucks 2013. All
© Mitsubishi Forklift Trucks 2013. All rights reserved.rights reserved. Revision: BRevision: B
Document ID: 615023Document ID: 615023
57 (244)57 (244)
PBV20N2 PBV20N2 Service Service ManualManual
Assembly of the Assembly of the load wheeload wheel:l:
1.1. Place the load wheel into the bracket.Place the load wheel into the bracket.
2.2. Push the bolt through the bracket and the load wheel. Be careful not to damagePush the bolt through the bracket and the load wheel. Be careful not to damage
the bolt threads.the bolt threads.
3.3. Tighten the bolt holding the load wheel in the bracket.Tighten the bolt holding the load wheel in the bracket.
4.4. Check that the load wheel rotates properly.Check that the load wheel rotates properly.
5.115.11
Lifting system and fork Lifting system and fork carriagecarriage
Figure 37. Lifting system and fork carriage overviewFigure 37. Lifting system and fork carriage overview
1.1. Fork carriage shaftFork carriage shaft
2.2. LinkLink
3.3. Chassis shaftChassis shaft
4.4. Slide bearingSlide bearing
5.5. Tub pinTub pin
6.6. Push rod shaftPush rod shaft
7.7. Load wheel fork shaftLoad wheel fork shaft
The lift cylinder handles the lifting of The lift cylinder handles the lifting of the fork carriage, while the the fork carriage, while the push rod mechanismpush rod mechanism
assists in raising the fork tips. For stable lifting, it is assists in raising the fork tips. For stable lifting, it is important that there is not too muchimportant that there is not too much
play in the linkage mechanism. Below you can find the play in the linkage mechanism. Below you can find the instructions regarding theinstructions regarding the
disassembly of the linkage mechanism. Assemble the linkage mechanism by repeatingdisassembly of the linkage mechanism. Assemble the linkage mechanism by repeating
the steps in reversed order.the steps in reversed order.