EasyManua.ls Logo

MoeBot S5 - Laying the Boundary Wire

MoeBot S5
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 11 -
Then screw on the outer ring to secure the
cable in place and prevent water ingress.
Push the cover back to its original position
to cover the wires and connections from
water ingress.
Once the base station has been fully wired,
it can be secured in place with the four
screws provided. Use the allen key provided
to screw them in securely ensuring they are
fully inserted and flush with the station
base. Protruding screws can hinder the
mower from locating correctly.
Making sure the power is switched o at
the socket, screw the two charging rods
into the holes just below the cover of the
base station. Note: This is where the LED
status indicator is situated. See page 22.
LED status indicator