EasyManua.ls Logo

Molnar SM Series - Page 17

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 17
Molnar 4 Post Hoist SM4X0
Installer Checklist
Installer must complete (tick) the following list after installing this Molnar hoist:
o Legal clearances around hoist
o Floor is suitable and within manufactures specifications
o Cables, pulleys and/or hoses are free of any damage
o All pulleys/pins have been greased. (Transverse beam and platform pulleys)
o Safety devices, limit switches and controls have been checked for correct operation
o Hydraulic system checked and leak free at time of installation
o Hoist tested without and with load as per manufactures specifications
o Hoist has been lubricated and adjusted as per manufactures specifications
o Log book use has been explained to owner/operator and initial details completed
o The client representative has been shown and instructed in the correct operation and
maintenance of the hoist
Distributor (vendor) Hoist
Company Installation Date
Branch Model Number
Serial Number
Hoist Owner Installer Details
Business Name
Name Company
Position Signature
Signature
These records should be retained for administrative and warranty assistance.
Log books are available from Molnar Services or Molnar Hoists distributors.
Part Number: 8209001 - Hoist Log Book Kit