Outlines the owner's maintenance responsibilities and schedule.
Tasks to be performed within the first 6 weeks of operation.
Tasks to be performed annually.
Tasks to be performed every two years.
Major inspection tasks required every ten years.
Procedure for removing the release cable covers.
Procedure for removing cylinder covers.
Steps to remove the hydraulic cylinder from the hoist.
Criteria for determining when balance cables need replacement.
Procedure for inspecting balance cables and pulleys.
Steps to check the balance cable adjustment.
Detailed procedure for adjusting balance cables.
Steps to remove balance cables and bottom pulleys.
Steps to install new balance cables and bottom pulleys.
Procedure for replacing the top balance cable pulley.
Procedure for inspecting and lubricating carriage slide block tracks.
Steps for replacing carriage slide blocks.
Steps to replace pickup pads.
Procedure for replacing door protectors.
Troubleshooting noise and vibration issues during hoist operation.
Troubleshooting problems with hoist stability and lock engagement.
Troubleshooting hoist lifting capacity and motor function.
Diagnosing and resolving oil leaks from various hoist points.