EasyManua.ls Logo

Molnar M245-A - SAFETY

Default Icon
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
SAFETY
Always follow local safety regulations as a priority when conducting maintenance and repairs.
Personal protective equipment
Gloves
Ear & eye protection
Steel capped boots
Safety cones, warning,
signs and tape
Attention
Notes marked require
specific attention to ensure
procedure is completed
safely and correctly.
Electrician
A licensed electrician must
perform all electrical work
including power connection
and wiring.
TOOL LIST
Listed here are tools and equipment Molnar Hoists recommend for performing maintenance and repair
work on the M245 ‘Universal’ Two Post Hoists.
Standard Maintenance Tool Kit
> Flat Blade Screwdriver
> Phillips Head Screwdriver
> Metric Allen Key set
> Clamp wrench (Vice Grips)
> Rubber mallet
> Hammer
> Large Adjustable wrench
> Small Adjustable wrench
> Torque wrench with ½” drive
(minimum 155Nm torque capacity)
> Metric Spanner Set
> 9/16” open ended spanner
> Metric Socket and Ratchet Set
> Deep Series 24mm socket
> Needle-nose pliers
> External circlip pliers
> Black Texta
> 2.4 metre platform-style step ladder or an
appropriate elevated work platform
> 1200mm spirit level
> Soft, Lint-free cloth (to protect cylinder
rod)
Repairs Tool Kit
Pry bar
Oil funnel
½” drive impact gun
27mm Spanner or Socket
Drip Tray
Empty oil container with min. 20 litre
capacity
Packers (for cylinder support during
removal)
‘F’ Clamp
Small Plastic Bags
Cable Ties
Masking Tape
Recommended Cleaning Kit
Eye Protection
Rubber Gloves
Soft bristle brush
Lint-free, soft cloths

Related product manuals