QUICK START GUIDE
Classic Plus 26
• Moving the unit and installaon of cold air outlet ducts:
1 2
3
.
4
NEXT
PAGE
Refer to the operaon manual and pay aenon to all the warnings and cauons throughout the manual
Typical Installaon Opons
NOTE: Refer to the operaon manual for details on choosing the installaon site
A) Roll the unit into the space that needs cooling
1) Unlock the casters and move the MovinCool
unit to a flat, level surface and set the casters
back to the LOCKED posion.
B) OPTION 1 set up steps
• Warm air flange aachment to the unit:
1) Aach the warm air flange using the screws
included with it.
3) Place the duct over the flange on the top of the unit (see figure below).
• Warm air duct aachment to the ceiling le:
1) Holding the other end of the duct firmly about 1 away from the end, rotate the
end of the duct counterclockwise to decrease the diameter of the duct enough
to pass through the 12” hole in the ceiling le.
4) Again hold the duct firmly, about 1 away from the end over the flange
(see figure below).
5) Rotate the duct end counterclockwise unl the diameter reduces to an
appropriate size (see figure below).
2) Pass the duct through the 12” hole on the ceiling le (see figure below).
3) Repeat the step number 1) but this me rotate the end of the duct in clockwise
direcons unl duct diameter increases enough to lock inside the ceiling le (see
figure below).
• Removal of original ceiling le:
Remove the original selected ceiling le from the ceiling (if the le is 2’ x 4’, then cut
the le into 2’ x 2’ and place one piece back into the ceiling at the end).
• Installaon of the ceiling le with the duct:
Place the ceiling le (with the duct) inside the ceiling.
C) OPTION 2 set up steps
• Condenser Air Plenum Installaon:
1) Remove both of the filter frame assemblies from
the condenser side panel by liing them up and lng
outward at the boom as indicated by the arrows above.
2) Remove the filter elements from the filter frames
by pressing outward on the re-tainer at the indicated
points (A), then, opening the retainer (B).
(Save the filter frames for future use).
3) Temporairly remove the five (5) screws from the le side
of the rear panel.
(Save the screws for step 5 below).
4) Turn the latches of the Air Plenum counterclockwise
unl they stop. Place the Air Plenum over the
condenser openings and align the hinge/bracket
assembly mounng holes with the respecve screw
holes on the back of the unit.
5) For ease of installaon, turn the latches to the full clock-
wise posion. (This will hold the front part of the Plenum
onto the unit). Aach the hinge/bracket of the
Air Plenum to the rear of the unit using the original
five (5) screws that were temporarily removed in step 3.
Shrink
Ceiling Tile
Self
Supported
Duct
Self Supported Duct
Ceiling Tile
Warm Air
Flange Kit
481170-0191 1
Warm Air
Flange Kit
481170-0191 1
Unlocked
Locked
2) Install each cool air outlet duct using 4 screws
each as shown.
(2 cool air outlet ducts included with the unit).
• Warm air duct aachment to the unit:
1) Hold the duct firmly, about 1 away from the
end.
2) Rotate the end of the duct clockwise to increase
the duct diameter (see figure). This procedure
usually takes 2 people.
1 Foot
Expand
Hold Here
A
B
CONDITION TO USE OPTION 1
CONDITION TO USE OPTION 2
No negave air pressure** in the room
and the temperature of the infiltrated
air is below the room temperature.
Between 70
°F (21 °C) to 113 °F (45 °C)
Operang temperature Range:
Negave air pressure** in the room.
Between 70
°F (21 °C) to 113 °F (45 °C)
Operang temperature Range:
*Accessories Sold Separately
NOTE:
•
Ensure that the warm air moves away from the ceiling and the heat is dissipated.
If your applicaon does not meet this requirement, then extend the duct to the nearest
exhaust point based on the Maximum Equivalent Length listed in the operaon manual.
**The combinaon of the following could create negave air pressure:
-
MovinCool unit is installed and runs using OPTION 1.
-
Door to the room is closed.
-
No other source of air entering the room.