MTS Exceed™ Series 40 Site Preparation Guide
40
Moving E44 and E45(Standing position) Frames
Lift and Move Instructions
6. Place the load frame carefully into position.
7. Remove the lifting straps from the top plate, and any protective padding, if
used.
When the frame is in its testing location, you can proceed with the installation
process.
Lifting Load Frame with a Crane
Crane Hook
Lifting Sling
Load Frame
Do not exceed 30
°
Hoist Ring

Other manuals for MTS Systems Exceed 40 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the MTS Systems Exceed 40 Series and is the answer not in the manual?

MTS Systems Exceed 40 Series Specifications

General IconGeneral
BrandMTS Systems
ModelExceed 40 Series
CategoryTest Equipment
LanguageEnglish

Related product manuals