INSTALLATION CHECKLIST & REQUEST FOR AUTHORIZED START-UP ENGINEER
CUSTOMER: _______________________________________
JOB NAME: ________________________________________
JOB LOCATION: _____________________________________
CUSTOMER ORDER NO.: ________________________________
CHILLED WATER Yes No N/A
Piping complete and connected to Multistack Units.
q q q
Water system lled and vented.
q q q
Pumps installed (Rotation checked).
q q q
Recommended strainers installed.
q q q
Controls (3-way valves & by-pass valves, etc.) operable.
q q q
Water system operated and ow balanced to meet unit design requirements.
q q q
Strainers checked for unusual debris.
q q q
Flow or dierential pressure switch installed.
q q q
CONDENSER WATER Yes No N/A
Piping complete and connected to Multistack Units.
q q q
Cooling tower ushed, lled and vented.
q q q
Pumps installed (Rotation checked).
q q q
Recommended strainers installed.
q q q
Controls (3-way valves and by-pass valves, etc.) operable.
q q q
Cooling tower fans wired and operable.
q q q
Condenser water system operated.
q q q
Condenser & evaporator strainers must be checked, cleaned and free of debris.
q q q
Flow or dierential pressure switch installed.
q q q
ELECTRICAL Yes No N/A
Power wiring complete and in accordance with nameplate rating on Multistack unit and prepared for connec-
tion in accordance with installation manual.
q q q
NOTE: No power is to be applied to unit prior to inspection by Multistack engineer.
All interlock wiring complete between control panel and complies with Multistack specications and with
applicable codes.
q q q
MISCELLANEOUS Yes No N/A
Thermometer wells, thermometer gauges, control, etc. installed.
q q q
A minimum system load of 50% of total building load is available for testing and
adjusting controls.
q q q
We understand that authorized representatives of the installing electrical and piping contractor must be available during the start-up period and that
coordination is our responsibility.
We further understand that the services of Multistack Authorized Start-up Engineer will be furnished for a period of not more than sixteen (16) consecutive
normal working hours and we agree that a charge for time and expenses will be made by Multistack if services are required for longer than sixteen (16)
consecutive normal working hours or if repeat calls are required through no fault of Multistack.
Signed Title