EasyManua.ls Logo

NAMCO Ace Driver Victory Lap User Manual

NAMCO Ace Driver Victory Lap
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Operators Manual
IT IS THE RESPONSIBILITY OF THE OPERATOR TO MAINTAIN CUSTOMER SAFETY AT
ALL
TIMES, AND IT IS IMPERATIVE THAT THE DETAILS SET OUT IN THIS MANUAL
ARE
FOLLOWED PRECISELY,
Part No. 90500024
Question and Answer IconNeed help?

Do you have a question about the NAMCO Ace Driver Victory Lap and is the answer not in the manual?

NAMCO Ace Driver Victory Lap Specifications

General IconGeneral
BrandNAMCO
ModelAce Driver Victory Lap
CategoryArcade Game Machines
LanguageEnglish

Summary

SAFETY WARNING

Warnings for Operation

Safety precautions for operating the game machine.

Disassembly, Installation, Routine Maintenance and Troubleshooting Warnings

Safety guidelines for maintenance, setup, and troubleshooting.

1. SPECIFICATIONS

Power Supply Details

Information on the machine's electrical power requirements.

Monitor Specifications

Details about the game's display monitor.

Coin Acceptor Information

Specifies the model of the coin acceptor.

Physical Dimensions and Weight

Size and mass of the assembled machine and components.

Included Accessories List

List of items provided with the game, like keys and manuals.

2. PRECAUTIONS

Cautions during Transporting

Safety advice for moving the machine.

Cautions during Handling

Precautions for safe interaction with machine parts.

Cautions during Operation

Safety measures to follow while playing the game.

Cautions during Installation

Guidelines for safe and proper machine setup.

3. HOW TO PLAY

Game Summary and Objective

Overview of the game's goal and winning conditions.

Championship Point Mode Details

Explanation of scoring and ranking in championship play.

Starting the Game Procedure

Step-by-step guide to initiate a game session.

5. INSTALLATION

Connecting Seat Assemblies to Cabinet

Procedure to attach seat units to the main cabinet.

Adjusting Machine Level

Steps to ensure the machine is stable and level.

6. LINKING TWO OR MORE MACHINES

Setting Link Switches for Connectivity

Configuration of switches for connecting multiple machines.

7 ADJUSTMENTS

Turning on the Main Power

Procedure to power on the machine after installation.

Adjustment Switches Overview

Location and function of switches for game settings.

Test Mode Operations

Accessing and navigating various diagnostic tests within the game.

Adjustments After Part Replacement

Initialization procedures required after replacing game components.

8. MAINTENANCE

Replacing the Fluorescent Lamp

Step-by-step guide for changing the fluorescent tube.

AB Pedal Assembly Maintenance

Servicing procedures for the accelerator and brake pedal assembly.

Shift Assembly Maintenance

Steps for maintaining the gear shift mechanism.

Steering Assembly Maintenance

Procedures for servicing the steering wheel components.

9. PARTS

Component Identification and Part Numbers

List of machine parts with their corresponding part numbers.

10 SCHEMATIC

Related product manuals