EasyManua.ls Logo

NCR FastLane SelfServ Checkout 7358 - Page 21

NCR FastLane SelfServ Checkout 7358
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Non-Scale 2-Bag Bagwell Upgrade 17
c. Lift Bagwell up and away from the Core Cabinet. The upper screw heads will
pass through the key holes in the Bagwell side support.
Note: The two (2) upper screws may be left in place if a new Bagwell will be
installed in the same orientation. Otherwise, remove the screws from the side of
the Core.

Related product manuals