Non-Scale 2-Bag Bagwell Upgrade 33
2. Unplug the ACPower Out and AC Power In cables from the Power Strip. ACPower
In Cable will be reused in the new Bagwell. AC Power Out Cable should be routed
either through the left-hand or right-hand lower Core access cutout into the new
Bagwell.
Note: The Power Strip remains on the rear Core wall but not reused.
3. Finish routing the cables into the Bagwell. For more information, refer to Routing
Cables on page30.