EasyManua.ls Logo

NCR FastLane SelfServ Checkout 7358 - Page 37

NCR FastLane SelfServ Checkout 7358
37 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Non-Scale 2-Bag Bagwell Upgrade 33
2. Unplug the ACPower Out and AC Power In cables from the Power Strip. ACPower
In Cable will be reused in the new Bagwell. AC Power Out Cable should be routed
either through the left-hand or right-hand lower Core access cutout into the new
Bagwell.
Note: The Power Strip remains on the rear Core wall but not reused.
3. Finish routing the cables into the Bagwell. For more information, refer to Routing
Cables on page30.

Related product manuals