EasyManua.ls Logo

NEC N8103-149 - Connect the Battery Backup Unit

NEC N8103-149
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
52
1-2. Connect the Battery Backup Unit
Each Server has different procedure to install the BBU. Refer to the servers manual to
check the steps.
Do not apply the pressure on hold the part shown in figure with too much power.
Parts might be damaged.
Be attentive to the direction of connectors when you connect
BBU(N8103-153/154/155/162) to a RAID controller with a Battery Control Cable.
Align BLACK dot on the connectors of a Battery Control Cable with the
Connector of RAID controller / BBU.
If you reverse connection, parts might be damaged.
N8103-160
N8103-149/150/151/172/173/174
N8103-153/154/155/162
BLACK dot
BLACK dot
BLACK dot

Table of Contents

Related product manuals