2” Spin Klin
Shipment and transporting
Shipping and transporting the filter must be done in a safe and stable manner and in accordance with the relevant
standards and regulations.
For shipping, lifting and positioning the filter, use only approved lifting equipment and authorized employees and
contractors.
Electricity
Electric wiring should be performed by an authorized electrician only, using standardized and approved components.
The system must be installed with suitable electrical earthing that would prevent any electrostatic discharge from the
system.
Install a lockable main power cut-off switch close to the control panel.
If due to site constraints, the control panel is installed without a clear line-of sight of the filter, an additional lockable
power disconnect cut-off switch should be installed near each filter unit.
Installation of the filter should be performed so as to avoid direct water splashing on the electrical components or on
the control panel.
Pneumatics
Install a lockable main cut-off switch, featured with a pressure release mechanism, on the compressed air supply line
close to the control panel.
If the control panel is installed far away and there is no eye contact with the filter, a lockable compressed air cut-off
switch, featured with a pressure release mechanism, should be installed near each filter unit.
The user should make sure that the compressed air supplied to the filter never exceeds the maximum designated
pressure for this filter. An air-pressure reduction valve should be installed on the compressed air supply line upstream of
the filter’s pneumatic inlet port.
Hydraulics
Extra safety devices should be installed on hot water applications to avoid skin burn danger.
The user should install a manual Water Cut-off Valve next to the filter’s inlet port.
In cases where the downstream piping network downstream of the filter is pressurized an additional manual Water Cut-
off Valve should be installed next to the filter outlet port.
The user should make sure that the system includes a Pressure Release / Drainage Valve to enable release of residual
pressure prior to any maintenance procedure performed on the filter.
The user should make sure that the filter is never exposed to water pressure exceeding the maximum designated
pressure for this filter, if needed a Pressure Reduction Valve should be installed upstream of the filter’s water inlet port.
Please note that the maximum working pressure indicated at the filter’s specifications table includes the pressure
caused by fluid hammer and pressure surge effects.
Civil Engineering
Make sure that the filter installation is done by the manufacturer-qualified technicians.
Make sure that any civil engineering work at the installation site such as construction, lifting, welding, etc. is done by
qualified workers / technicians / contractors and in accordance with the relevant local standards.
While using lifting equipment, make sure that the filter or the lifted part is chained securely and in
a safe manner.
Do not leave lifted equipment if there is no necessity. Avoid working below lifted equipment.
Wear a safety helmet while using lifting equipment.
Make sure that the flooring is sloped to for drainage and to avoid accumulation of liquids.