(1) Host interface card
(2) Thumbscrews
5. Hand-tighten the HIC thumbscrews.
Do not use a screwdriver, or you might over-tighten the screws.
6. Using a #1 Phillips screwdriver, attach the new HIC faceplate to the controller canister with the four screws
you removed previously.
Step 5: Reinstall controller canister
Reinstall the controller canister into the controller shelf after installing the new host interface card (HIC).
Steps
1. Reinstall the cover on the controller canister by sliding the cover from back to front until the button clicks.
2. Turn the controller canister over, so that the removable cover faces down.
3. With the cam handle in the open position, slide the controller canister all the way into the controller shelf.
The following figure is an example of an E2824 controller shelf or EF280 flash array:
22

Other manuals for NetApp E2824

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NetApp E2824 and is the answer not in the manual?

NetApp E2824 Specifications

General IconGeneral
ModelE2824
CategoryStorage
Form Factor2U
Drive Bays24
Maximum Raw Capacity1.8PB
Host Interface12 Gb/s SAS
RAID SupportYes
Hot-Swap DrivesYes
RAID Levels0, 1, 5, 6, 10
Power SupplyDual redundant
Drive TypeSAS, SSD
Host Connectivity12Gb/s SAS
ControllerDual active controllers