EasyManua.ls Logo

NEW ENERGY NE-B345/100E - User Manual

Default Icon
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
DC INVERTER HEAT PUMP
Installation And Operation Instruction
Question and Answer IconNeed help?

Do you have a question about the NEW ENERGY NE-B345/100E and is the answer not in the manual?

Summary

II. Parameters

1. Parameters

Details specifications like model, size, weight, and power source.

2. Appearance

Visual representation of the heat pump unit.

3. Attention

Important notes and warnings for users before and during operation.

III. Main introduction of product

1. Detail parameters

Comprehensive technical specifications for the heat pump models.

IV. Installation

1.1 installation position

Guidance on selecting the correct location for unit installation.

1.2 Attention

Lists specific places where units should not be installed due to potential issues.

1.3 Units installation foundation

Guidance on creating a stable foundation for the heat pump unit.

1.4 Safety relief valve installation requirement

Specifies requirements for installing the safety relief valve.

1.5 Piping installed demand

Outlines the demands and requirements for piping installation.

2. Piping diagram

Provides a diagram illustrating the piping connections for reference.

3. Circuit connection

Important considerations and warnings for connecting the electrical circuit.

3.2 Electric wiring diagram

Illustrates the electrical wiring diagram for the unit.

V. Trial operation

Check before operating

Lists essential checks to be performed before starting trial operation.

E. Trial run to be checked

Details the specific items and conditions to check during the trial run.

VI. Control system instruction

1. Operation illustration

Explains the display interface and its symbols.

1.2 wired controller display declaration

Declares and explains the various elements displayed on the wired controller.

1.3 wired controller operation

Provides instructions on how to operate the wired controller using its keys.

1.3.5 Inquiry running parameters

Explains how to inquire and view running parameters of the unit.

1.3.6 Common parameters setting

Details the process for setting common operational parameters.

1.3.7 Fault display

Describes how the controller displays fault codes and information.

1.3.8 Clock setting

Instructions for setting the clock on the controller.

1.3.9.2 Enter timing setting

Guides the user on entering the timing setting mode for scheduling.

1.3.10 Memory function

Explains the memory function for saving settings.

1.3.11 Backlight setting

Instructions for adjusting the controller's backlight.

1.3.12 Running parameters list

Lists and defines various running parameters monitored by the system.

VII. Maintenance

1.Maintenance protection

Provides guidelines for protecting and maintaining the unit.

2. Error code and solution

Details error codes and their corresponding solutions for troubleshooting.

2.2 solutions

Lists common phenomena, reasons, checks, and solutions for unit issues.

NEW ENERGY NE-B345/100E Specifications

General IconGeneral
BrandNEW ENERGY
ModelNE-B345/100E
CategoryHeat Pump
LanguageEnglish

Related product manuals