CONTENTS
7
16
6
21
22
22
23
20
1. Preparing the pool
2. Delivery and recepon of the roller
3. Assembling the roller
4. Electric connecons
5. Assembling the slats
6. Sha connecon with the slat cover
7. Adjusng the control box limit switches
8. Test guide in the event of a malfuncon
9. Checks
10. Recepon of the cover by the end user
11. Appendix: troubleshoong assistance tool