Do you have a question about the nifty TM Series and is the answer not in the manual?
Lists critical safety rules and operational requirements that must be followed at all times.
Mandatory systematic inspection procedures before putting the aerial platform into service.
Checklist of essential safety inspections to be performed each day before operation.
Routine safety inspections to be conducted on a weekly basis.
Detailed steps for starting and operating the machine using ground controls.
Explains how to control the telescope, boom, and swing functions from the ground.
Detailed steps for starting and operating the machine using platform controls.
Explains how to control the telescope, boom, and swing functions from the platform.
Final checks and procedures required to prepare the machine for use after transport or storage.
Emphasizes the importance of operator familiarity with emergency controls.
| Horizontal Reach | Up to 6.1m |
|---|---|
| Platform Capacity | Up to 200kg |
| Outriggers | Standard |
| Rotation | 360° continuous |
| Lift Capacity | Up to 200kg |
| Working Outreach | Up to 6.1m |
| Working Height | Up to 12.2m |
| Platform Height | Up to 10.2m |