WW Competence Transfer
CMO Operations & Logistics
Multimedia Creation & Support CONFIDENTIAL
29.03.2006
18
 Service Manual E60 RM-49 Copyright © 2006 NOKIA Corporation. All rights reserved.
Approved 2.0
MGR
Page
(25)
17.) Position the UI PWB Assy. Note the guiding.
18.) Insert the six Torx Plus size 6 screws.
19.) To prevent damaging the plastic theads, turn the 
screws to the left first (1), then tighten them slightly (2).
20.) Apply the torque of 22 Ncm  to the screws in the 
shown order.
21.) Place the Joystick Button.
22.) Place the T9 Keymat.
23.) Remove the plastic film.
24.) Glue the Grounding Foam onto the Display Shield.