Figure 7-1 Gas Line Connection (Typical)
Apply propane gas compatible pipe sealing compound to the male-end of all treaded
connections before assembly. Support boiler gas line connection during assembly of
gas piping to prevent damage to internal boiler components. Failure to follow these
instructions may result in fire, property damage, serious injury or death.
Test all gas piping, internal and external to the boiler, for leaks. Failure to follow
these instructions may result in fire, property damage, serious injury or death.
Drip Leg / Sediment Trap
(field supplied)
Union
(field supplied)
Manual Gas Shutoff Valve
(Factory Supplied)
Should overheating occur or
the gas supply fails to shutoff,
close the Manual Gas Shutoff
Valve to the boiler.
Gas Supply Line
Must be externally supported.
DO NOT support with boiler
gas line connection.