EasyManua.ls Logo

NuWave Pro Plus - Assembly and Initial Setup; Assembly Guide; Cooking Instructions

NuWave Pro Plus
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
11
Connecting Power Head to Dome
Assembling the Full NuWave Oven
NuWave Oven Pro Plus
Assembly Guide
Lock
Place Power Head on the rim of the
Dome and lock it into place by rotating
the Power Head clockwise until the
locking lugs are engaged.
Place Base Tray on a firm, stable
surface.
Place Liner Pan inside Base Tray. When
doing so, make sure the handles are
in the dropped down position. If the
handles are not fully dropped, the Dome
may not fit over the base properly.
Place dual level Cooking Rack on
the Liner Pan according to cooking
requirements.
Place food on the rack.
Place Dome with Power Head over food,
connecting to the Base Tray. The Dome
should fit evenly onto the base.
Set cook time and temperature
according to recipe requirements.
BEFORE USING:
Prior to the first use of your NuWave Oven,
wash Dome, Liner Pan, Base, and Cooking
Rack in warm soapy water or run through a
dishwasher cycle.
IMPORTANT - Do not wash or immerse Power
Head in water or cycle through dishwasher. The outer
surface may be cleaned by wiping carefully with a
damp dishcloth or sponge.
Step 3
Place the assembled Power Head and
Dome at a 45° angle on the holder as
shown.
Note: Do not leave Dome in Dome
Holder for an extended period of time.
Only lift Dome by the handles on
the Power Head. Once the Power
Head and the Dome are assembled,
the handles will allow you to lift both
together when removing or checking
food. When removing Liner Pan after
cooking, be extremely careful and
always use oven mitts.
For best results, follow the time,
temperature, and Cooking Rack height
instructions provided in the cooking
chart and recipe book.
No preheating required.
How to Install and Use Dome Holder
Make sure the Power Head is tightly locked onto the
Dome. The whole assembly can be easily lifted and
put aside as shown in steps 1, 2 and 3.
Step 1
Place Dome Holder under either
side of base handle.
Step 2
Make sure both feet of the Dome Holder
are situated inside the handle, and the
Dome Holder is resting horizontally on a
flat surface.
Cooking Instructions
Owner’s ManualOwner’s Manual

Other manuals for NuWave Pro Plus

Related product manuals