Do you have a question about the OEC 9800 Periodic and is the answer not in the manual?
Covers crucial safety warnings, handling precautions, ingress of water, unauthorized modifications, electrical shock, and X-radiation exposure.
Lists required tools, test equipment, specifications, and guidance on completing the PM form.
Details powering down the system and removing covers to access internal components for maintenance.
Verifies the proper function of brakes, wheels, and mechanical movements of the C-Arm and Workstation.
Guides on inspecting the electrical plug, power cord, interconnect cable, and ground continuity.
Covers powering up the system and measuring line voltage regulation under various load conditions.
Details checks for isolation transformer secondary output and various DC power supply voltages.
Inspects generator battery performance and checks fan operation and air filters in workstation and C-arm.
Verifies operation of C-Arm controls, workstation keyboard functions, and image adjustments.
Tests various imaging modes (Fluoro, Pulse, Spot) and special features.
Outlines film exposure, beam alignment tests, centering, and dose rate measurements.
Details tests for radiographic and fluoroscopic kVp accuracy at different settings.
Guides on performing DAP calibration, measuring dose rates, and calculating coefficients.
Provides instructions for replacing PCB batteries and FluoroTrak UPS battery.
Covers reinstallation of covers, testing steering, and final system power-on.
Details saving, printing, signing, and distributing the completed PM form.
Covers crucial safety warnings, handling precautions, ingress of water, unauthorized modifications, electrical shock, and X-radiation exposure.
Lists required tools, test equipment, specifications, and guidance on completing the PM form.
Details powering down the system and removing covers to access internal components for maintenance.
Verifies the proper function of brakes, wheels, and mechanical movements of the C-Arm and Workstation.
Guides on inspecting the electrical plug, power cord, interconnect cable, and ground continuity.
Covers powering up the system and measuring line voltage regulation under various load conditions.
Details checks for isolation transformer secondary output and various DC power supply voltages.
Inspects generator battery performance and checks fan operation and air filters in workstation and C-arm.
Verifies operation of C-Arm controls, workstation keyboard functions, and image adjustments.
Tests various imaging modes (Fluoro, Pulse, Spot) and special features.
Outlines film exposure, beam alignment tests, centering, and dose rate measurements.
Details tests for radiographic and fluoroscopic kVp accuracy at different settings.
Guides on performing DAP calibration, measuring dose rates, and calculating coefficients.
Provides instructions for replacing PCB batteries and FluoroTrak UPS battery.
Covers reinstallation of covers, testing steering, and final system power-on.
Details saving, printing, signing, and distributing the completed PM form.
| Type | Mobile C-Arm |
|---|---|
| X-Ray Tube | Rotating anode |
| Digital Subtraction Angiography (DSA) | Yes |
| Generator Power | 15 kW |
| Image Intensifier | 9" |
| Monitors | Dual monitors |
| kV Range | 40 to 120 kV |
| mA Range | 0.2-75 mA |
| Focal Spot Size | 0.3 mm |
| Exposure Time | Up to 10 seconds |
| Weight | Approx. 350 kg |
| Power Supply | 50/60 Hz |
Loading...