6. Check the voltage between TP3 and TP1 (ground). If necessary, adjust trim pot R30 to give a reading of of +24.1 ±1%Volts.
7. Check the voltage between TP6 and TP1 (ground). If necessary, adjust trim pot R7 to give a reading of -6.10 Volts (+.25
Volts ±1%).
8. Check the voltage between TP5 and TP1 (ground). If necessary, adjust trim pot R31 to give a reading of +6.25 Volts ±1%.
9. Check the voltage between TP4 and TP1 (ground). It should measure +14.1 Volts ±10%.
10. Check the voltage between TP4 and TP2 (ground). It should measure –14.1 Volts ±1%.
Note: If one or more DC outputs do not meet specifications, replace PS2.
Generator Calibration
WARNING: The following procedures require you to take X-rays. Take appropriate precautions to
protect yourself and others.
CAUTION: The following procedure is critical to the safe operation of the C-Arm. Improper adjustment may cause
premature failure of major system components.
CAUTION: The following procedures require you to handle devices that are susceptible to damage from
electrostatic discharge (ESD). Take appropriate measures to avoid equipment damage.
High Voltage Supply Regulator (HVSR) Setup
1. Power down the Workstation and put the High Voltage Supply Regulator (HVSR)
on an the extender PCB.
2. Power up the system and allow it to boot completely.
6