EasyManua.ls Logo

OEG KSW-E Series - Page 44

OEG KSW-E Series
272 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENG
Installation manual
44
1. Unscrew both screws (a) from the controller (b) and remove it from the base (c).
2. Remove cable inlet lids (d) and place the cables. Left cable inlet is for sensor cables,
right cable inlet is for power supply cables.
3. Place the base into the boiler and fasten it with the mounting hooks (e).
4. Carry out electrical connection, put the controller (a) back into the base, and fasten it
with screws (b).
d
e
b
4
d
b
a
d
e
a
c
b
a
The installation into a boiler panel cutout is carried out in the following way:
INSTALLATION INTO THE PANEL CUTOUT

Table of Contents