40496501TH Draft Version 85
1. Matching the phase of pin tractors
a. Match the direction of pin wheel projections on right/left pin tractor to that of mark on the 2 (rear
tractor drive gear)
b. Match the direction of wheel projections on right/left pin tractor to that of mark on 4 (drive gearB), an
install 2(drive gear B) to 5 3 (rear drive shaft of the rear tractor Assy) at a position where the
directions of marks on 4 (drive gear B) and 2 (rear tractor drive gear) match.
8 Assembling friction piece
Open up the notch to 1mm and assemble it,
positioning the notch as shown in figure.
Notch is rotated by 45°
Rotated notch
45°
Wheel
Pinwheel
Match the direction of projections
Match the position of marks
Rear tracor Assy Gears phase drawing
4